On Wednesday, July 20 we moved out of the shed at Dozier's Regatta Point Marina into the main basin so the hardtop frame could be installed. Actually we moved back into the shed as soon as we could to get out of the sweltering heat since we did not have any protection from the sun.
On Thursday, July 21 the canvas guys came and spent the day. They measured and drilled holes for the new enclosure. The next day was the record temperature of 105 with the heat index of 120. That was when Jim started his drilling to pull the wires throughout the frame. Some wires are for LED ceiling lights over the table and others are now there for anything else he may want to add at a later date. All this needed to be finished before the next step.
On Thursday, July 21 the canvas guys came and spent the day. They measured and drilled holes for the new enclosure. The next day was the record temperature of 105 with the heat index of 120. That was when Jim started his drilling to pull the wires throughout the frame. Some wires are for LED ceiling lights over the table and others are now there for anything else he may want to add at a later date. All this needed to be finished before the next step.
<< Home